• Please use tab to navigate through video controls.
  • Upon entering the player press space bar to reach the play button

Phase One: Grand Sluice. Stop log liners being lifted into place.

Here you can see our contractors lifting a stop log liner into position. They are doing this from the water using a crane on a barge.


Phase One: Embankments. Stone being loaded onto a barge ready to be transported for embankment toe works.
Phase One: Embankments. Stone being loaded onto a barge ready to be transported for embankment toe works.
Phase One: Grand Sluice. Stop logs being factory tested.
Phase One: Grand Sluice. Stop logs being factory tested.
The stop logs have already been made and are being stored ready for when we need to use them. Here they are in the factory being tested using a special rig that is designed to mimic the conditions of Grand Sluice.
Phase One: Grand Sluice. Stop log liners being lifted into place.
Phase One: Grand Sluice. Stop log liners being lifted into place.
Here you can see our contractors lifting a stop log liner into position. They are doing this from the water using a crane on a barge.