Background

    Where is this site?

    Granville Woodhouse Landfill (also known as Redhill Landfill) is located in Telford. The operator holds an Environmental Permit. Potters (Midlands) Ltd took over the permit in January 2019. 

    What permit(s) does the operator hold?

    EPR-RP3739QB is an environmental permit that allows the site to accept a wide range of non-hazardous and biodegradable wastes. This permit contains conditions that control site operations, including landfill cell construction, waste acceptance limits, emissions control and environmental monitoring.  

    Granville Landfill is a heavily engineered landfill formed from individual cells constructed with a clay and geomembrane liner to protect the surrounding area of the cell.  


    Regulatory Activity

    Since March 2024, reports of odour from Granville landfill have increased. After ongoing monitoring, we identified steps for the operator to take in order to improve the landfills gas management system and odour control. The operator has now completed these actions.  

    They have installed new gas wells and have completed the capping work required. These measures aim to provide greater protection for the community and the environment, as well as maximising gas collection in the long term so incidents of odour are less likely to occur. 

    We will continue to monitor odours, track progress against the agreed plan and review the operator's management plans to ensure it is working in accordance with its permit. 

Latest News

    What is the latest news?

    7 August 2026

    We are aware of an incident at the Granville Landfill site on 6 August involving a fire in a piece of mobile plant used in site operations. Shropshire Fire and Rescue Service attended the site, and the fire was extinguished within three hours.

    Environment Agency officers have been in contact with the site operator and will be reviewing the circumstances of the incident to determine whether any further action is required. Based on the information currently available, we are not aware of any damage to the wider site infrastructure, or that any landfill waste was burnt.

    We recognise that any incident at the site may be concerning for local residents. We will continue to regulate the site in line with its environmental permit, including carrying out site inspections and monitoring compliance with permit conditions. We will provide further updates if additional information becomes available.

    For all previous updates regarding Granville Landfill please click here.

Frequently Asked Questions

    Who is the planning authority for Granville?

    Telford and Wrekin Council are the planning authority for Granville Woodhouse Landfill.  

    How do I report odour for Granville Landfill?

    Our new online reporting tool is now live. To report odour online please visit click here.