October 2025 - St Ives Sluice
We have carried out repairs to the St Ives Sluices, bringing 3 gates back into automatic operation. These repairs will not provide long term resilience but should help maintain navigation levels during high flows over the coming winter period.
The remaining four gates continue to be isolated in the closed position to maintain statutory water levels for navigation.