Millmead footbridge

    We will replace Millmead footbridge and the adjacent brick structure with a longer clear-span bridge, and reshape the upstream riverbank to ensure water can move safely and efficiently. 

    We asked the general public which colour railings (green or white) they would prefer for Millmead footbridge. The majority of respondents preferred white railings, suggesting this would make them more visible, similar to the existing bridge and in-keeping with the traditional canal heritage.  

    Walnut Tree bridge proposals

    At Bedford Wharf, we will landscape the area between the flood defence and the river, creating attractive new public spaces for everyone to enjoy. This design not only enhances the riverside environment but also provides additional capacity for flood water, helping to protect the town. 

    On the east side of the river, the current concrete ramps to the footbridge restrict flood flows. While the existing bridge will remain, we will replace the ramps with a new elevated walkway, carefully designed to complement the bridge’s character. This improvement will keep the route across the river open and accessible, ensuring a welcoming connection into the town centre whatever the weather.

    Town Bridge modifications


    Removal of decorative ironwork 

    Currently the decorative ironwork under Town Bridge  is a restriction to flows. We are proposing to remove the ironwork to increase the flow capacity in the channel, allowing more water to pass through under the bridge. 

    Removing brick abutment walls 

    We will also remove the brick abutment walls. The walls will be replaced with open railings, for water to move more easily through.