June 2026

Addison Road SUDS

Images showing rain gardens with planting along Addison Road

Completed in 2026, these rain gardens store 11.6 cubic metres of water, reducing flood risk to the surrounding properties.

June 2026

Forest Way rain gardens

Images showing rain gardens with planting along Forest Way

Completed in 2026, these rain gardens store 6.6 cubic metres of water, reducing flood risk to the surrounding properties

June 2026

Knighton Close

Images showing rain gardens with planting along Knighton Close

Completed in 2026, these rain gardens store 21.3 cubic metres of water, reducing flood risk to the surrounding properties.

March 2026

Knighton Drive

Images showing rain gardens with planting along Knighton Drive

Completed in 2026, these rain gardens store 9.3 cubic metres of water, reducing flood risk to the surrounding properties.

July 2026

Harewood Drive

Images showing rain gardens with planting along Harewood Drive

Completed in 2026, these rain gardens store 13 cubic metres of water, reducing flood risk to the surrounding properties

March 2026

Stoneleigh Road

Images showing rain gardens and planting along Stoneleigh Road

Completed in 2026, these rain gardens store 34 cubic metres of water, reducing flood risk to the surrounding properties

July 2026

High Road Seven Kings

Images showing completed project and a cross section showing how Hydro rock was installed

Completed in 2026, the Hydrorock permeable paving stores 61 cubic metres of water, reducing flood risk to the surrounding properties. You can find out how Hyrdorock works here: https://www.redbridge.gov.uk/news/september-2025/redbridge-council-rolls-out-innovative-hydrorock-flood-defence-technology-following-successful-trial/

September 2026

Claybury, Hydrorock permeable paving

Images showing completed Hydrorock paving in Claybury

Completed in 2026, the Hydrorock permeable paving stores 119 cubic metres of water, reducing flood risk to the surrounding properties. You can find out how Hyrdorock works here: https://www.redbridge.gov.uk/news/september-2025/redbridge-council-rolls-out-innovative-hydrorock-flood-defence-technology-following-successful-trial/

September 2026

SuDS in School: Woodland Primary School

Images showing contractors and school children planting the rain gardens at Woodland Primary School

Ongoing project in partnership with the Department of Education to reduce flood risk by adding rain gardens and planters to absorb rainwater. 

October 2026

River Roding project

Ongoing: 

Aerial view of the embankment construction site taken on 5 October 2026

The Environment Agency are building a flood storage area on the River Roding which aims to reduce flooding to around 1,500 homes, businesses and infrastructure in Woodford and Ilford.

Follow the link below to find out more information and sign up to updates. 

The River Roding Project | Engage Environment Agency (link opens a new window)