The Canch - Incident Response

During Storm Claudia, the Askham Field Team worked diligently to manage water levels and protect Worksop town centre from flooding. To increase the flow of the River Ryton through Kings Park, the penstock at the Canch was opened, allowing greater water discharge and reducing pressure upstream. This proactive measure ensured that excess water was diverted safely away from vulnerable areas, minimising the risk of damage and maintaining public safety during the weather event.

#<Object:0x00007f630f13a3c0>